George Harrison Soccer Complex Phase 2

Work includes vegetation removal, site grading, demolition, concession building, drainage installation, asphalt and concrete paving, signage, fencing, and installation of soccer fields, utilities, landscaping, irrigation and lighting.
Addenda (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
Addendum No. 1 9.0 MB
Addendum No. 2 2.0 MB