PROJECT DESCRIPTION:
The Project consists of maintenance upgrades to the Beale Street Landing facility including but not limited to dredging, demolition, high performance coatings, electrical work, geolam decking replacement, guardrail maintenance, and the fabrication and replacement of a steel access gate.
The owner intends to occupy the Project throughout construction. The contractor shall keep the site operational for dockings, allowing safe space for passengers and crew to board and deboard vessels. An exception will be made if dredging requires the removal of the barge. In the event the barge must be removed, the contractor shall coordinate the removal with the owner. The existing barge will be removed by the owner from its location against the mooring arms to facilitate the sediment removal.
The Beale Street Landing Deferred Maintenance Phase II package is planned to begin concurrently with the construction of Phase I. The contractors awarded Phase I and Phase II must work collaboratively to ensure that neither phase is disrupted or adversely impacted during the construction process.
Hard copy sets of plans and specifications are available for purchase, or files may be downloaded for free from our online plan room. For questions about accessing the documents please contact Memphis Reprographics at 901-590-4862.